Removal of architectural barriers and renovation of paving in the Retiro district


Removal of architectural barriers and renovation of paving in the Retiro district

Actions to remove architectural barriers and to renew of pavements in Calle Pez Austral, in the Madrid district of Retiro.

Client:
Retiro District, Madrid City Council
Location:
Madrid
Period:
2022
Type of work:
Public roads and signage
Budget:
€499,996
The work involves rehabilitation works in the field of gardening, landscaping and civil works, including:
 
• Disassembly and removal of existing street furniture in the area of action.
• Demolition of existing pavements and removal of kerbs.
• Disassembly and assembly of lamps and posts.
• Disassembly and assembly of existing traffic lights.
• Adaptation of entrances.
• Surfacing of pavements with hydraulic tiles and granite terrazzo.
• Surfacing of dropped kerbs with 8 cm thick per-cast paving stones.
• Surfacing of drainage areas with 8 cm thick draining paving stones.
• Placement of Fuencarral model bollards.
• Installation of a new irrigation network with polyethylene pipes of different diameters.
• Planting of ornamental trees.
• Manufacture of manholes and gutters.

This action is part of the Framework Agreement for refurbishment, repair and conservation works for all buildings and green spaces, as well as the execution of works on public roads and spaces under the authority of the Retiro District, Section 4: Public Spaces.

 
DETAILS

Technical data

Removal and demolition
- 810 ml kerb removal
- 2,714 m² demolition of pavement flooring
- 2,053 m² demolition of asphalt pavement
- 1,185 m³ demolition of concrete slabs
- Disassembly of 40 bollards, 10 posts, 10 lamps, 4 traffic lights, 20 fibreglass screens and 3 benches
Total paved area
- 998 ml pre-cast kerbstone
- 2,930 m² granite terrazzo
- 512 m² hydraulic tile
- 472 m² coloured pre-cast paving stone
- 56 MBC AC 16/22
- 140 m² mastic asphalt gutter
- 890 m² laying of granite kerbstones
Garden area
- 7 units ornamental trees (platanus hybrida)
- 12 m³ topsoil
 
Street furniture
- 38 Fuencarral model bollards
- 6 MU-51 universal bicycle racks
Downloads


Gallery