230 homes in Sevilla Este


230 homes in Sevilla Este

Construction of a main building with 190 homes and two blocks containing 20 homes each, making a total of 230 homes, garages, commercial premises and tertiary premises in the Sevilla Este area.

Client:
Edificio Goya 63, S.L.
Location:
Seville
Period:
August 2018 (18 months)
Type of work:
Residential
Budget:
€ 20,845,801 (VAT not included)
Architect:
ATRIO, Estudio de Arquitectura, S.L.P.

Construction of main building containing 190 homes and two units of 20 homes each for a total of 230 homes, garages, commercial premises and tertiary premises in the Sevilla Este area.

The foundation and ground support is achieved through foundation slabs and reinforced-concrete walls. Structure is load-bearing due to reinforced concrete pillars and core walls and horizontal waffle-grid framework with sunken coffers and solid reinforced-concrete slabs.

Exterior wall cladding composed of multilayer cladding, half-brick pattern of perforated ceramic brick to cover and self-supporting paneling. Above-ground wraparound system on facades through ETICS system, aluminum composite panel, wood-cement composite panel according to area.

Roofing composed of a base layer of a gradient of M-5 mortar, adhesive waterproof double layer LBM(SBS)-30-FV+ LBM(SBS)-40-FV, geotextile separating layer and 4 cm M-5 cement mortar regulation layer. The roof cover includes 14x28 cm ceramic tile flooring, 85 mm filtering and insulating tiles in communal rooftop areas, porous concrete 35 mm surface and in private rooftop areas 30x30 cm stoneware floor tiles and ceramic skirting board.
 
Interior divisions made from plasterboard sheets, using a double half-brick wall for separations between houses and tertiary use and communal and undefined local zones.
 
Porcelain stoneware coating on step of interior stairs in habitable spaces; class 32 laminate surface and skirting board in houses; matte porcelain stoneware tile flooring in large format in houses and continuous mass concrete and/or printed surface in zones of other use. Cobblestone flooring, colored tile flooring, artificial grass surfaces, on terrace paving stones and a swimming pool surface of artificial decking in uninhabitable spaces.

 
DETAILS

Technical data

Execution period
18 months.
 
Foundation/ structure
16,694 m3 of concrete for foundation and structure.

41,687 m2 of formwork.

1,747,354 kg of B500S corrugated steel.

Brickwork
72,624 m2 of plasterboard sheets for lining, partitions and ceilings.

44,864 m2 of masonry for half-brick walls, cinder blocks and patching.
 

Cladding
40,310 m2 of tiling and flooring.

11,685 m2 of ETICS facade.