Construction of a building for the Lleida Municipal Police Department


Construction of a building for the Lleida Municipal Police Department

Construction of a building for the Lleida Municipal Police Department

Client:
Municipal Government of Lleida
Location:
Lerida
Type of work:
Specific
Architect:
Manuel Gómez

Excavation to create a basement space (14,864 m3) and the excavation for level surfaces and wells (379 m3).

Superficial foundation for ditches and wells, a concrete slab, concrete retaining walls in situ and a temporary steel anchor.

The roof is a walkable inverted roof finished with a marble surface on support beams with a IPE flooring.

 

Gallery